Emergency bolting crews on call 24/7 across Saudi Arabia+966 50 605 8927alviqaisar@gmail.com
Southern & Northern Regions · Pipe Cold Cutting

Pipe Cold Cutting Services in NEOM

NEOM projects need large volumes of accurate pipe cuts and bevels. Our crews support contractors with machines kept on site.

Pipe Cold Cutting in NEOM

Cold cutting support at NEOM

Desalination, water, power, industrial and green hydrogen facilities are being built at NEOM by many contractors at once. Pipe cold cutting at NEOM supports them with accurate cuts and weld preps on carbon steel, stainless and alloy pipe, and with spark-free cuts once systems are commissioned.

Each cut is made by a parting tool and a bevel tool turning together on a frame centred on the pipe, which gives a square, machined end ready for fit-up.

Most pipe cold cutting jobs in NEOM are part of a wider joint repair, so the same crew can also handle bolt torquing in NEOM and the other services below. For methods, equipment and standards, see our main pipe cold cutting services in KSA page.

Industrial pipeline valve with handwheel
Pipe Cold Cutting for plants in NEOM
Typical jobs

Pipe Cold Cutting jobs we do in NEOM

Work we are regularly asked for at construction, utilities, hydrogen sites in and around NEOM.

01

Stainless and alloy weld preps

Machining accurate bevels on stainless and alloy pipe for hydrogen and process systems.

02

Tie-in cuts on live units

Opening existing lines for new branches while the rest of the plant keeps running.

03

Pipeline section changes

Removing damaged pipeline sections and preparing ends for new pipe or fittings.

How it works

Our pipe cold cutting process in NEOM

Four steps, run under your permit-to-work system and recorded for your files.

  1. Review and isolate

    We confirm line size, schedule and content, and your team isolates and clears it under permit.

  2. Support and mount

    The pipe is supported either side and the split frame is clamped and centred.

  3. Cut and bevel

    Parting and bevel tools feed in together at low speed until the wall is through.

  4. Check and hand over

    Bevel angle, land and squareness are checked before the end is handed to your welders.

Mobilization

Getting a pipe cold cutting crew to NEOM

NEOM work is a planned project mobilization, with crews and tools kept on site for the scope.

Machines, tools and consumables are checked against your scope before departure, and the crew arrives with PPE, permits planned and the paperwork your site asks for.

Calibrated equipment

Instruments and tools travel with current calibration certificates, listed in the job record.

Single point of contact

One supervisor coordinates pipe cold cutting with bolting and the other joint services on the NEOM job.

FAQ

Pipe Cold Cutting in NEOM: common questions

Do you subcontract cold cutting at NEOM?

Yes. We supply machines, operators and records as a subcontractor, working to the project quality plan.

Can you cut and bevel in one set-up in NEOM?

Yes. The parting tool and bevel tool run on the same frame, so the pipe is cut and bevelled in one set-up, including compound bevels and J-preps.

What pipe sizes can you cold cut in NEOM?

Our split-frame machines cover small-bore lines up to large-diameter pipe. Send the outside diameter, schedule and material and we will confirm the machine.

Request a quote

Request pipe cold cutting in NEOM

Send the project scope and cut list for NEOM. We will reply with a crew plan and price.

Scroll to Top