Emergency bolting crews on call 24/7 across Saudi Arabia+966 50 605 8927alviqaisar@gmail.com
Western Region · Pipe Cold Cutting

Pipe Cold Cutting Services in Yanbu

Yanbu refineries and petrochemical plants are as tightly packed as any in the Kingdom, so turnaround cuts there are done cold.

Pipe Cold Cutting in Yanbu

Cold cutting for Yanbu turnarounds

Yanbu Industrial City hosts several refineries, an NGL plant and petrochemical complexes running long cycles between shutdowns. Pipe cold cutting in Yanbu removes spools and valves in the shutdown window and prepares the ends for welding, without adding hot-work load to an already crowded permit system.

Each cut is made by a parting tool and a bevel tool turning together on a frame centred on the pipe, which gives a square, machined end ready for fit-up.

Most pipe cold cutting jobs in Yanbu are part of a wider joint repair, so the same crew can also handle bolt torquing in Yanbu and the other services below. For methods, equipment and standards, see our main pipe cold cutting services in KSA page.

Industrial pipeline valve with handwheel
Pipe Cold Cutting for plants in Yanbu
Typical jobs

Pipe Cold Cutting jobs we do in Yanbu

Work we are regularly asked for at refineries, ngl, petrochemicals sites in and around Yanbu.

01

Refinery spool cut-outs

Removing corroded spools from refinery units during shutdowns and bevelling the ends for new pieces.

02

Pipeline section changes

Removing damaged pipeline sections and preparing ends for new pipe or fittings.

03

Tie-in cuts on live units

Opening existing lines for new branches while the rest of the plant keeps running.

How it works

Our pipe cold cutting process in Yanbu

Four steps, run under your permit-to-work system and recorded for your files.

  1. Review and isolate

    We confirm line size, schedule and content, and your team isolates and clears it under permit.

  2. Support and mount

    The pipe is supported either side and the split frame is clamped and centred.

  3. Cut and bevel

    Parting and bevel tools feed in together at low speed until the wall is through.

  4. Check and hand over

    Bevel angle, land and squareness are checked before the end is handed to your welders.

Mobilization

Getting a pipe cold cutting crew to Yanbu

For Yanbu shutdowns we send tool containers by road ahead of time and fly crews in for the first shift.

Machines, tools and consumables are checked against your scope before departure, and the crew arrives with PPE, permits planned and the paperwork your site asks for.

Calibrated equipment

Instruments and tools travel with current calibration certificates, listed in the job record.

Single point of contact

One supervisor coordinates pipe cold cutting with bolting and the other joint services on the Yanbu job.

FAQ

Pipe Cold Cutting in Yanbu: common questions

Can you support a full Yanbu turnaround with cold cutting?

Yes. We send machines ahead by road and size the crew to the cut list and shutdown schedule.

Can you cut and bevel in one set-up in Yanbu?

Yes. The parting tool and bevel tool run on the same frame, so the pipe is cut and bevelled in one set-up, including compound bevels and J-preps.

What pipe sizes can you cold cut in Yanbu?

Our split-frame machines cover small-bore lines up to large-diameter pipe. Send the outside diameter, schedule and material and we will confirm the machine.

Request a quote

Request pipe cold cutting in Yanbu

Send the unit, cut list and shutdown dates in Yanbu. We will reply with a crew plan and price.

Scroll to Top