Modifications at Abqaiq are tested at high pressure before crude flows again. We run the tests and record the results.

Hydrotest in Abqaiq

High-pressure hydrotests in Abqaiq

Pipeline manifolds, pump stations and processing systems at Abqaiq operate at high pressure, so tie-ins and repairs must be proven before return to service. Hydrotest services in Abqaiq provide high-pressure pumps, calibrated instruments and controlled pressurising.

After sign-off the system is depressurised, drained and, where the service needs it, dried. Our bolting crew removes the blinds and reinstates the permanent joints.

Most hydrotesting jobs in Abqaiq are part of a wider joint repair, so the same crew can also handle bolt torquing in Abqaiq and the other services below. For methods, equipment and standards, see our main hydrotest services in KSA page.

Process piping and valves inside an industrial facility
Hydrotest for plants in Abqaiq
Typical jobs

Hydrotest jobs we do in Abqaiq

Work we are regularly asked for at crude processing, pipelines sites in and around Abqaiq.

01

Manifold tie-in tests

Testing new tie-ins on pipeline manifolds before return to service.

02

Valve shell and seat tests

Pressure testing valves after overhaul.

03

Pipeline section tests

Filling, testing and dewatering pipeline sections after construction or repair.

How it works

Our hydrotesting process in Abqaiq

Four steps, run under your permit-to-work system and recorded for your files.

  1. Review the test pack

    Test boundaries, pressure, hold time and isolations are confirmed.

  2. Prepare and fill

    Blinds, vents and drains are fitted and the system is filled and vented.

  3. Pressurise and hold

    Pressure is raised in stages, held and recorded while the system is inspected.

  4. Drain and reinstate

    The system is drained, dried if needed, and permanent joints are reinstated.

Mobilization

Getting a hydrotesting crew to Abqaiq

Abqaiq is a short drive inland from Dammam. Security is strict, so we arrange passes and inductions well before the job.

Machines, tools and consumables are checked against your scope before departure, and the crew arrives with PPE, permits planned and the paperwork your site asks for.

Calibrated equipment

Instruments and tools travel with current calibration certificates, listed in the job record.

Single point of contact

One supervisor coordinates hydrotesting with bolting and the other joint services on the Abqaiq job.

FAQ

Hydrotest in Abqaiq: common questions

How do you control high-pressure tests in Abqaiq?

Pressure is raised in stages with checks at each step, relief protection is fitted and the area is kept clear.

Who removes the test blinds after the hydrotest?

Our bolting crew removes temporary blinds and gaskets and reinstates the permanent joints, tightened to a calculated load.

What test pressure do you use for hydrotests in Abqaiq?

The test pressure comes from the code that governs the system and its design conditions, as set out in your approved test pack.

Nearby

Hydrotest near Abqaiq

Our hydrotesting crews also work in these nearby cities.

Hydrotest across Saudi Arabia

Request a quote

Request hydrotesting in Abqaiq

Send the system details and dates for Abqaiq. We will reply with a plan and price.