Emergency bolting crews on call 24/7 across Saudi Arabia+966 50 605 8927alviqaisar@gmail.com
Eastern Province · Nitrogen Purging

Nitrogen Purging Services in Jubail

After a Jubail turnaround, units cannot come back online until air is out of the system. We purge to the oxygen target and prove it.

Nitrogen Purging in Jubail

Purging Jubail units at both ends of a shutdown

Olefins, polymer and refining units in Jubail Industrial City must be gas freed before they are opened and inerted before hydrocarbons go back in. Nitrogen purging in Jubail covers both ends of the shutdown, with measured targets agreed with operations and readings recorded at each sample point.

We purge to a measured target. The system volume, purge method, injection and vent points and the oxygen or hydrocarbon limit are agreed before nitrogen is introduced.

Most nitrogen purging jobs in Jubail are part of a wider joint repair, so the same crew can also handle bolt torquing in Jubail and the other services below. For methods, equipment and standards, see our main nitrogen purging services in KSA page.

Plant piping with valves and flanged connections
Nitrogen Purging for plants in Jubail
Typical jobs

Nitrogen Purging jobs we do in Jubail

Work we are regularly asked for at petrochemicals, refining, utilities sites in and around Jubail.

01

Reactor inerting

Keeping reactors and catalyst beds inert during catalyst changes and start-up.

02

Pre-start-up inerting

Removing air from systems before hydrocarbons are introduced after a shutdown or for the first time.

03

Nitrogen leak testing

Pressurising systems with nitrogen and checking every flanged joint before process gas goes in.

How it works

Our nitrogen purging process in Jubail

Four steps, run under your permit-to-work system and recorded for your files.

  1. Plan the purge

    We set the volume, method, sample points and target with your operations team.

  2. Set up supply

    Liquid nitrogen with vaporisers or cylinder packs are positioned with relief protection.

  3. Purge and sample

    Flow and pressure are controlled while readings are taken at agreed points.

  4. Confirm and record

    Consecutive readings meet the target, are witnessed and handed over in writing.

Mobilization

Getting a nitrogen purging crew to Jubail

Jubail is a short drive from our Eastern Province base, so crews and equipment containers usually arrive the same day.

Machines, tools and consumables are checked against your scope before departure, and the crew arrives with PPE, permits planned and the paperwork your site asks for.

Calibrated equipment

Instruments and tools travel with current calibration certificates, listed in the job record.

Single point of contact

One supervisor coordinates nitrogen purging with bolting and the other joint services on the Jubail job.

FAQ

Nitrogen Purging in Jubail: common questions

Can you purge several Jubail units in parallel?

Yes. We size nitrogen supply and crews to the start-up schedule so several systems can be purged at the same time.

What oxygen level do you purge to in Jubail?

The target is set by your site procedures and the next activity. Inerting before hydrocarbons go in commonly aims for a low single-digit oxygen percentage or less, agreed before we start.

Can you supply nitrogen for jobs in Jubail?

Yes. We arrange liquid nitrogen with vaporisers for large volumes or cylinder packs for smaller systems, or use the supply already on site.

Request a quote

Request nitrogen purging in Jubail

Send the systems, volumes and start-up dates in Jubail. We will reply with a purge plan.